AH-64D PPC PDF

The Flight Performance Models (FPMs) embedded in the PPC application are based on flight test data and the performance charts in the AHD Operator’s. This manual provides specific guidelines for executing AHD aircrew Performance planning card (PPC) DA Form R (UH/AH Get the da form 64 r. Description of ah 64d ppc pdf. DEPARTURE PA FAT LOAD TAKEOFF GWT lb SINGLE ENG DUAL ENG FUEL MSN ATF ETF TR MAX .

Author: Vizuru Fenrile
Country: Equatorial Guinea
Language: English (Spanish)
Genre: Travel
Published (Last): 1 November 2011
Pages: 355
PDF File Size: 11.16 Mb
ePub File Size: 11.68 Mb
ISBN: 639-8-47125-558-4
Downloads: 49813
Price: Free* [*Free Regsitration Required]
Uploader: Fenridal

ppc A valuable lesson learned from this deployment is that units should focus early on power management issues and train accordingly so that they are prepared when deployed. On a daily basis, we had power available to hover out of ground effect OGE.

We knew that it would not be long before power was a luxury that we would not have. This cell always contained at least one of the unit instructor pilots.

  ISAPNITI STORIES PDF

I slowly increased the power until I drooped the rotor and then decreased the collective. By the end of April, the temperature at Kandahar was nearing degrees Fahrenheit.

AH-64 Apache Operations In Afghanistan

Each mission required performance planning for altitudes, temperatures, and gross weights that were much higher than we normally operate. Kandahar is approximately 3, feet mean sea level MSL and can be characterized as high desert. We arrived in Afghanistan near the end of January and were based out of Kandahar International Airport.

Our first mission took us from Kandahar to Bagram Airbase to refuel and then on to the eastern city of Khowst. Performance planning was a critical part of each mission.

AHD Block 2 PPC Book – Study Material

We adapted to this environment well, but were fortunate to have a wealth of experienced aviators in our company. While en route to Khowst, we crossed a snow-covered ah-664d at 11, MSL.

During the deployment, we were exposed to a wide range of temperatures, a variety of flight environments, and altitude extremes that ppv had never operated in before.

  IN PRAISE OF SLOW CARL HONORE PDF

During our missions in Afghanistan, we had two aviators assigned to our performance-planning cell. The terrain is relatively flat with rolling sand dunes 10 miles west and a mountain range approximately 15 miles to the north.

AH-64D Apache (Longbow)

Within three weeks of our arrival, our missions started taking us to higher and higher altitudes. We quickly learned that power management was a skill necessary to survive our deployment.

We had already conducted numerous missions to include Operation Anaconda. The racetrack patterns and running fire tactics we utilized were necessary due to insufficient power to hover and to increase our own survivability. Aah-64d the winter months at Kandahar, our aircraft performed well.