BS EN 12350-1 PDF

Buy BS EN TESTING FRESH CONCRETE – PART 1: SAMPLING from SAI Global. said in BS EN , take a few samples throughout the pour for the best representation of the batch and make sure you take % of what you think you’ll . This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot.

Author: Mazugis Faezuru
Country: Singapore
Language: English (Spanish)
Genre: Spiritual
Published (Last): 24 February 2007
Pages: 448
PDF File Size: 4.77 Mb
ePub File Size: 14.62 Mb
ISBN: 875-6-73393-175-4
Downloads: 91934
Price: Free* [*Free Regsitration Required]
Uploader: Goltikasa

Customers who bought this product also bought BS EN Apparatus Container, large enough to provide at least 75 mm 123350-1 concrete in all directions around the sensor of the temperature measuring device, or at least three times the NMAS Nominal Maximum Aggregate Sizewhichever is greater.

BS EN 12350-1/BS EN 12350-2/BS EN 12390-2/BS EN 12390-2

Where required, the specification of a maximum time between placing layers of concrete should take account of the likely temperature of the concrete, cement type, mix proportions, the use of admixtures with set retarding properties and consistency of the concrete.

Concrete having coarse aggregate up to 40 mm in size. Rod each layer 25 times using the rounded end of the tamping rod. For this to occur the delay should be sufficient for the lower layer to develop an initial set or harden. Metallic, Frustum of a cone Alternative materials are allowed if requirements are met comparability tests Tamping Rod Round, straight steel rod, length mm and diameter 16mm Tamping end rounded to a hemispherical tip Measuring Device Ruler Marked in 12305-1 of 5 mm or smaller Length of at least mm In addition, a scoop is needed.

You may experience issues viewing this site in Internet Explorer 9, 10 or Mechanical vibration using Compacting with an internal vibrator Apply the vibration for the minimum duration necessary to achieve full compaction of the concrete. The time for this to occur depends on the concrete temperature, cement type, mix proportions, the use of admixtures with set retarding properties and consistency of the concrete.

NOTE The requirement for remixing the sample before tests on the fresh concrete, or before making test specimens, is included in the relevant standards. Need more than one copy? You may delete a document from your Alert 12305-1 at any time.

  ESPASMO ESOFAGICO DIFUSO PDF

Pressure methods BS EN When mixing and sampling of concrete is done in a laboratory, different procedures may be required. Complete the temperature measurement within 5 min except for concrete containing the coarse aggregate of a nominal maximum size greater than 75 mm which 12530-1 require up to 20 min for the transfer of heat from the aggregate to the mortar.

Sampling of fresh concrete at site. Concrete cubes at the site Marking The test specimens shall be marked clearly and indelibly, without damaging the specimen using a cub tag that contains the information related to the specimen Casting date, ticket number, specimen ID, location of sampling….

Protect the sample from the sun, wind, and other sources of rapid evaporation, and from contamination.

Quantity at least 1. In the case of self-compacting concrete, the mould shall be filled in one operation and no mechanical compaction shall be applied during filling or after the mould is filled.

This standard is also available to em included in Standards Subscriptions. Want access to British Standards? This European Standard wn two procedures for sampling fresh concrete, by composite sampling and by spot sampling. Extended delays in placing can lead to a significant loss of consistency with time making it impossible to place with satisfactory compaction.

You can download and open this file to your own computer but DRM prevents opening this file on another computer, including a networked server. The Amber document status indicator indicates that some caution is 123550-1 when using this document – it is either: If a falling away or shearing occurs, disregard test and make a new test using another portion of the sample.

Create a website or blog at WordPress. The requirement for remixing the sample before tests on the fresh concrete, or before making test specimens, is included in the relevant standards. The faster, easier way to work with standards.

Click to learn more. Pack the hardened test specimens in wet sand or 12530-1 sawdust or wet cloths wet burlapor sealed in plastic bags containing water. Difference of the two samplings — Composite sampling is more diverse as it is the representative of the whole truck load.

  ANCHIMERIC EFFECT PDF

BS EN 12350-1:2009

Already Subscribed 12305-1 this document. The mold is raised and the concrete allowed to subside. Immediately measure the vertical difference between the height of the mould and that of the highest point of the slumped test specimen. Please download Chrome or Firefox or view our browser tips. Ideally placing subsequent layers of fresh concrete should be undertaken as soon as practical to enable a fully compacted and monolithic element.

BS EN – Testing fresh concrete. Sampling – BSI British Standards

There is often debate about the time limit between placing fresh concrete against fresh concrete already placed and compacted i. Add to Alert PDF. Procedure for Slump Test. Your 122350-1 Profile lists the documents that will be monitored. In some big projects, imagine the time consumed to perform the composite sampling when there is a lot of concrete truck mixers in queue at the checkpoint area.

Sampling of Freshly Mixed Concrete at the Field (BS EN ) – QA/QC Construction

Strike off the mold with the tamping rod in a screeding and rolling motion Remove concrete from the area surrounding the base to prevent interference with the movement of slumping concrete. Avoid over-vibration, which may cause loss of entrained air. Procedure for Slump Test Apparatus being readied for slump test activity Fill the mold in three layers of approximately equal height.

Free to use BIM project management tool provides step-by-step help to define, manage and validate responsibility for information development and delivery at each stage of the asset life cycle in level 2 BIM projects. The Red document bw indicator indicates that 1235-01 document is an old version The document has likely been withdrawn by the publisher, also the meta data presented here bz be out of date as it is no longer being maintained by the editorial teams at NBS. Leave a Reply Cancel reply Enter your comment here The elapsed time shall not exceed 15 min.

What is the time limit before placing of fresh concrete?

Clean all the apparatus prior to use.